|
Post by Advance The Man on Apr 29, 2010 16:57:11 GMT -7
...... I will put the full 42' out when preparing for ECD or PDDR....... Isn't that all of the time? ;D Nice setup. I wish I could find a space to lay out 42'....I would be much further along with my speed and consistency if I had a full length track. Good luck! When will we see you on the track?? O.R. Heck it annoys me with the door open. Probably the day before shipping I'll have the full track set up. ECD 5/22 and PDDR 6/5
|
|
|
Post by Shade Racing on Apr 30, 2010 3:08:24 GMT -7
what kind of timer is that for a 1 lane track
|
|
|
Post by Advance The Man on Apr 30, 2010 6:39:24 GMT -7
MWD - nice job on the lift/leveler system. I purchased BestTrack's leveler system. They didn't recommend the lift on less than 3 lanes. Where did you get them? I still have 1/32" gaps on some of the joints. Some only on one lane or the other. I would love to see ECD or PDDR' setup - probably could learn a ton just by looking. Lastly, will eventually install some sort of dampening material under the track. btw, yes your wife doesn't have to open the door, but she'll trip bringing those groceries in!
|
|